How to maintain a constant temperature incubator

1. Clean the condenser regularly (every 3 months): For air-cooled cooling of the compressor, the condenser fan should be regularly checked and the condenser should be decontaminated and dusted to ensure its good ventilation and heat transfer performance; In the case of water-cooled cooling, in addition to ensuring the inlet pressure and inlet temperature, the corresponding flow rate must be ensured, and the inside of the condenser should be cleaned and descaled regularly to obtain its continuous heat transfer performance.

2, regular (every 3 months) cleaning evaporation (dehumidification): Because the cleanliness of the sample varies, under the forced air circulation, the evaporation (dehumidification) will condense a lot of small particles such as dust, should be carried out regularly Cleaning.

3. Since the value of the temperature (wet) box is generally high, we recommend that it be placed in a relatively benign temperature environment. Our empirical temperature value is 8 ° C ~ 23 ° C. For laboratories that do not have this condition, it must be equipped. Proper air conditioner (air-cooled) or cooling tower (water-cooled).

4. Adhere to professional management. Units with conditions should send special personnel to the supplier factory for training and training to obtain more professional maintenance and repair experience and capabilities.

5, circulating fan, condenser fan cleaning and calibration: similar to the cleaning evaporator, because the working environment of the test box is different, the circulating fan, condenser fan will condense a lot of small particles such as dust, should be cleaned regularly .

6. Waterway and humidifier cleaning: If the waterway is not smooth and the humidifier is fouled, it may cause the humidifier to dry and may damage the humidifier. Therefore, the waterway and humidifier must be cleaned regularly.

7. After each test is completed, set the temperature near the ambient temperature, work for about 30 minutes, then cut off the power supply and wipe the inner wall of the working chamber.

8. If the equipment needs to be relocated, it is best to carry out under the guidance of our company's technical personnel to avoid unnecessary damage or damage to the equipment.

9, long-term shutdown is not used, the product should be energized every half month regularly, the power-on time is not less than 1 hour.